Plumbing quote profit calculator
True cost £170.50
Price £261.25
Profit £90.75
Margin 34.7%
Free, no sign-up, nothing is saved. How the figures are built explains each step.
Put this on a real quote
Cost the job, check the margin, send a PDF. 3 quotes free. Then £5/month or £50/year. Cancel anytime.
No card. No account.
Material markup is not the job margin
Most plumbers set a material markup of 20% or 25% and assume the job makes that. Markup is measured on cost; the margin a job makes is measured on price and has to cover labour, overhead and every other line, so a 25% material markup can be a 15% job margin. This calculator adds what a simple margin check leaves out: a waste allowance, a material markup separate from the job margin, and an overhead percentage on the whole direct cost. The margin vs markup calculator converts one percentage; this page shows the blend on a real job.
Costs that are easy to leave off a plumbing quote
- Waste: the pipe you cut and bin. Five per cent on pipe and fittings is common; sanitaryware and boilers are nearer zero.
- Consumables: flux, solder, PTFE, blades, gas. Add a small line per job or fold them into overhead.
- Parking and ULEZ, Clean Air Zone or congestion charges: two days in a city centre can be £30 to £60.
- Waste disposal of the old boiler, cylinder or bath, skip share, tip fees.
- Subcontractors: an electrician for a boiler fused spur, a plasterer for making good. Put what they charge you in cost and what you charge the customer on the quote.
- Hire, and return visits: commissioning, the part on back-order, the snag found a week later.
Run through the plumbing quote checklist before you send the price.
Overhead is a cost, not profit. If last year’s overheads were £12,000 on £80,000 of direct job costs, the percentage is 15%. The hourly rate calculator lists the overhead lines to collect.
Worked example 1: bathroom basin swap
Illustrative figures chosen to show the maths. Not a price guide.
Basin, mixer tap, waste, trap, tails, isolation valves and silicone cost £185. Waste 5%, material markup 25%. Three hours at £28 internal cost, charged at £65 an hour. Parking £8, passed on at cost. Overhead 10% of direct cost.
| Line | Internal cost | Customer price |
|---|---|---|
| Materials incl. 5% waste | £194.25 | £242.81 |
| Labour, 3 hours | £84.00 | £195.00 |
| Parking | £8.00 | £8.00 |
| Overhead 10% | £28.63 | — |
| Totals | £314.88 | £445.81 ex VAT |
Profit £130.94, margin 29.4%, markup on true cost 41.6%. The 25% material markup is a 20% margin on the materials; labour at £65 against £28 carries a much higher margin, parking carries none, and overhead takes £28.63 off the top. To reach a 30% target the pre-tax price would need to be £449.82, about £4.01 more.
Worked example 2: combi boiler swap
Boiler, flue, magnetic filter, fittings, cleanser and inhibitor cost £1,480. Waste 5%, material markup 20%. Fourteen hours over two days at £28 internal cost, charged at £60 an hour. An electrician fits a fused spur for £120 and you charge £150. Disposal of the old boiler £40 and two days of parking £16, passed on at cost. Overhead 10%.
| Line | Internal cost | Customer price |
|---|---|---|
| Materials incl. 5% waste | £1,554.00 | £1,864.80 |
| Labour, 14 hours | £392.00 | £840.00 |
| Electrician | £120.00 | £150.00 |
| Disposal and parking | £56.00 | £56.00 |
| Overhead 10% | £212.20 | — |
| Totals | £2,334.20 | £2,910.80 ex VAT |
Profit £576.60, margin 19.8%, markup on true cost 24.7%. With 20% VAT the customer total is £3,492.96. Leave out disposal, parking and overhead and the same job appears to make £844.80, which is the number that makes a thin job look comfortable.
Below target? Divide the true cost by one minus the target margin for the price you need (do not multiply by it), take cost out, or decline the job. Lowering the overhead percentage until the number looks right is not an option. The job cost vs selling price guide covers presenting the higher price without showing your costs.
Frequently asked questions
Why is my margin lower than my material markup?
Markup is measured on cost and margin on price, so a 25% markup is only a 20% margin on the materials. The markup also applies only to materials; labour, parking, subcontractors and overhead each carry their own margin, and the whole-job figure is the blend.
Should waste be included in the price?
Waste is part of your cost, so it belongs in the figure you mark up. Ten metres of pipe at £4 with 5% waste costs £42, and the selling value is built on £42, not £40. The customer sees a material line, not a waste line.
What overhead percentage should a plumber use?
Divide last year’s business overheads (van, fuel, insurance, tools, phone, accountant, registrations) by last year’s direct job costs. A sole trader with a van and no premises often lands between 10% and 20%; a firm with a yard and office staff is higher. The calculator starts at 10%.
Does the calculator include VAT?
No. Profit and margin are worked out on the pre-tax price, because VAT is collected for HMRC and is not yours. If you are registered, add 20% to the pre-tax price for the customer total; the VAT calculator does that.
Why is my profit lower than my material markup?
Markup only applies to materials. Labour at cost, waste and overhead all reduce the margin on the whole job, which is what this calculator shows.