How to quote a bathroom plumbing refit (UK)

Bathroom jobs go wrong on the quote when plumbing, tiling, electrics and making good are blurred into one vague number. This guide helps UK plumbers price the plumbing clearly — fixed or day rate — and state what someone else must do. It is not a homeowner shopping guide.

Decide what you are selling

If the layout is still undecided, prefer a day rate for first fix with a later fixed price for second fix, rather than one hopeful lump sum.

Scope checklist for the plumbing quote

  1. Isolate supplies; protect the rest of the house.
  2. Strip out existing bath/basin/WC/shower as listed; disposal included or excluded.
  3. First fix: hot, cold and waste runs; isolation valves; any soil or stack alterations you are actually doing.
  4. Second fix: fit and connect listed sanitaryware; silicon and test.
  5. Radiator or towel rail changes if included.
  6. Water on/off windows and expected duration.

Exclusions to write explicitly: tiling and waterproofing, flooring, plastering, extraction fans and electrics, moving a soil stack beyond a stated limit, unnoticed rotten floors or joists, asbestos.

Published ballparks (sense-check only)

Checkatrade’s plumbing installation guide (updated May 2026) cites an average around £3,250 to plumb a bathroom excluding sanitaryware supply, with a published range roughly £2,700–£4,000. Whole new bathrooms including materials are discussed elsewhere in much wider bands (for example £5,500–£8,000 in Checkatrade’s bathroom cost guides). Your job may be half a day of second fix or a full first-and-second-fix week — price the survey you did, not the national average.

Worked example (illustrative only)

Example only. Same-layout family bathroom, plumbing only, customer supplies suite, you supply pipe/fittings, fixed quote, good access.

Line (ex VAT)£
Pipe, fittings, wastes, valves at cost220.00
Waste/consumables allowance25.00
Materials markup (35% on £245)85.75
Labour 3 days × £400 day rate1,200.00
Disposal of old suite80.00
Quote subtotal (ex VAT)1,610.75

State that tiling, electrics and decoration are excluded. If opening-up reveals rotten timber or unusable pipework, stop and issue a variation. Check margin with the quote profit calculator before you send. Headings: checklist and template.

CIS note for builder work

When a main contractor pays you to fit a bathroom as construction work, CIS may apply. Show materials separately so deductions are worked on labour. Use the CIS deduction calculator for arithmetic, and confirm status with GOV.UK or your accountant — not via this guide alone.

Itemise the bathroom plumbing, then send a quote the customer can accept.

3 quotes free. Then £5/month or £50/year. Cancel anytime.

Try 3 quotes freeSee pricing

No card. No account.

Related

Frequently asked questions

Should bathroom plumbing be day rate or fixed?

Fixed when the layout and suite are locked and you have surveyed. Day rate when decisions are still moving or opening-up risk is high. Many jobs use day rate for strip/first fix and a fixed second-fix price later.

Who should quote the tiling?

A tiler, unless you genuinely offer that trade. If you only plumb, say tiling is excluded so the customer does not assume it is in your number.

What if the customer’s suite arrives damaged?

Your quote should say customer-supplied goods are fitted at their risk and that damaged or incomplete goods pause the job. Do not absorb supplier disputes into your margin by accident.

How do I keep the quote profitable?

True cost first, clear exclusions, then a whole-job margin check — not only a materials percentage. See how to price plumbing jobs.